Rice Ball Production Line
Rice ball production line, including a complete set of rice mills, multi-function grinding machine, multi-function nut roaster, rice ball machine and rice packing machine.
Most holidays are associated with at least one special food. In China, rice gluten balls are typically enjoyed on the 15th day of the first lunar month, also known as the Lantern Festival. Of course, they can be eaten during any festival, as these small, white, moon-like treats—with a filling of your choice—symbolize reunion and happiness.
Sample






Rice Ball Making Machine

Complete Rice Mill Plant

Multifunctional Grinding Machine

Rice Ball Machine

multifunction roasting machine

Pre-made Bags Packaging Machine

Vertical Form Filling Seal Machine
FAQ
ask us
anything
What is the daily production capacity of the production line?
The standard production line can process up to 500kg of glutinous rice per day, and can be customized up to 1 ton per day to meet production needs of varying scales.
What bag types are compatible with the packaging process?
We offer both pre-made bag packaging machines and vertical form-fill machines, adapting to various sizes, from 5g mini balls to 100g gift boxes. They are compatible with PE/PP composite film.
How are product microbiological indicators controlled?
The entire production line is constructed of food-grade 304 stainless steel, with UV sterilization lamps installed at key workstations. The packaging area meets Class 10,000 cleanroom standards and complies with HACCP certification requirements.
What are the advantages of the filling processing equipment?
The multifunctional grinder supports 12 fillings, including nuts, red bean paste, and jam. The particle size can be adjusted from 0.2 to 5mm, and the temperature control system ensures that the fillings do not burn.
Does the equipment require a professional technician to operate?
The entire production line is controlled by a PLC touch screen with eight preset production modes. Training is required to master the basic production process in just four hours.


Customer Reviews

