Industrial Tray Sealer with MAP

Tray sealer: pre-formed tray + top film + MAP gas flush.

Feature

  1. TRS-101 — 10 cycles/min: Manual tray load.
  2. TRS-001 — 25 cycles/min: Auto-feed + MAP.
  3. TRS-201 — 40 cycles/min: Dual-lane high-speed.
  4. Typical values throughout — configured to your line requirements.

Sample

Sample output from the Industrial Tray Sealer. Ask us for real production photos matched to your exact product and capacity.

emergency

We are Here for You. Contact us Now

⏰ 7 * 24 Support
🔧 Remote Support
🌍 Global Coverage

Parameters

Tray sealer: pre-formed tray + top film + MAP gas flush. 10-40 cycles/min. For fresh meat, seafood, ready-meals.

Model Range

ModelCapacityConfiguration
TRS-10110 cycles/minManual tray load.
TRS-00125 cycles/minAuto-feed + MAP.
TRS-20140 cycles/minDual-lane high-speed.

Typical values — each model is configured to your product, cut size, and line speed.

Where It's Used

Ready-meal and fresh food producers sealing pre-made trays with film, with MAP optional. For the full range, see the processing hub.

FAQ

MAP replaces air with a gas mix, so the tray keeps its shape and the product looks good, which suits fresh meat and seafood where appearance sells. Vacuum packs tight for maximum shelf life but compresses the product. For rigid pre-formed trays, MAP is the usual choice, and the same machine does plain sealing with the gas system off.

The sealer takes any pre-formed tray, with quick-change tooling per format, so you are not locked to one tray maker. Top films cover peelable, anti-fog, and high-barrier structures. The check is sealing temperature and dwell against your specific film and tray rim, which we test before tooling is finalized, because film and tray must seal to each other, not just to the machine.

Tooling change between tray sizes takes about 15 minutes. Guide rails, tray carriers, and the film cutting template swap as a set, and seal temperature and dwell recall from the stored recipe. Keep one tooling set per high-running format and changeovers stop being a planning event. Operators handle the swap unaided after training.

Seal quality starts with a clean tray rim, no product debris and no drips under the sealing face, since that causes most leakers. For detection, an inline water-bath or dry-leak tester option checks packs after sealing and rejects failures automatically. A periodic burst or dye test on sampled packs confirms the seal window is still correct.

Daily wipe of the seal tooling, monthly seal jaw cleaning with a full inspection of the silicone padding, and an annual vacuum pump and gas system service. Anti-fog films leave residue that quietly changes sealing behavior, so the monthly jaw clean matters more than people expect. Pumps and jaws are standard spares items with short lead times.

Yes. We provide installation and commissioning support, and 12 months of after-sales service, including spare parts help and technical response.

TAKE THE FIRST STEP. WE WILL DO THE REST.
Scroll to Top
small c popup.png

Get Your Production Line Plan Now

It will be sent to Boss and sales team directly.