We provide steam boilers, air compressors, CIP systems, cold storage, and water treatment for food plants.
This site uses cookies for analytics and to improve your experience. By clicking Accept, you consent to our use of cookies. Learn more in our privacy policy.
We provide steam boilers, air compressors, CIP systems, cold storage, and water treatment for food plants.
Model: CLD-001. Click to view full specifications, FAQ, and quote.
Model: CIP-001. Click to view full specifications, FAQ, and quote.
Model: STM-001. Click to view full specifications, FAQ, and quote.
Auxiliary systems — steam, compressed air, water treatment, CIP, and cold storage — rarely headline a quotation, but they decide whether a food plant runs at 85% or 60% uptime. Esper sizes and integrates all five.
| System | What It Feeds | Sizing Rule of Thumb |
|---|---|---|
| Steam boiler (STM) | Cookers, sterilizers, CIP heat | Sum all steam consumers × 1.25 diversity factor; prefer biomass where fuel exists on site |
| Air compressor (oil-free) | Valves, actuators, pneumatic fillers | Peak CFM × 1.2; oil-free Class 0 for direct product contact |
| Water treatment (RO) | Boiler feed, CIP final rinse, product water | Conductivity per use: boiler <10 μS, product water potable + mineral spec |
| CIP skid (CIP) | Every wet line | Recovery tank ≥2× largest circuit volume; spray coverage validated per tank |
| Cold storage (CLD) | Raw materials, WIP, finished goods | Product load + infiltration + 15% future headroom; −18°C frozen / 0–4°C chilled |
The classic failure mode: production equipment quoted at nominal capacity, utilities sized at average consumption. Then the sterilizer and CIP demand steam simultaneously during changeover — pressure drops, valves stall, and the ‘1,000 kg/h line’ delivers 700. We size utilities on the simultaneous peak, not the average.
Yes — integrated quoting is the point of this category: steam/air/water/CIP sized against your line’s simultaneous peak demand.
When shells, husks, or wood waste exist on site: typically 30–50% steam cost reduction vs gas in agro-processing plants.
Recovery for rinse water and caustic (60–80% reuse), single-pass final rinse for allergen-critical circuits.
Separate trains: boiler feed needs soft/RO <10 μS; product water needs potable + your mineral spec — mixing them wastes money or risks quality.
Skids 60–90 days; cold storage 45–75 days depending on panel supply.
Yes — send equipment list and steam/air consumption nameplates; we return a peak-load table with gap analysis.